Most of the preparation for a new driveway is practical: decide where cars will go while the drive is out of use, clear the area, tell neighbours about deliveries and machinery, show the installer where any drains, cables or pipes run, and settle questions like the dropped kerb and surface water before digging starts. A little planning avoids delays on the day and keeps the job moving.
Settle the design questions early
Final details should be agreed before the first day, not while the digger is waiting. Confirm the outline, the levels at the house and the pavement, where edging and steps go and how the drive meets the front door. If you are choosing between materials, our block paving vs resin guide helps. Changes after excavation are possible, but they slow the work and can affect the base already laid.
Check permissions and the kerb
A new hard surface at the front may need planning permission if it is not porous or does not drain to a lawn or border, as explained in our driveway planning permission guide. Crossing a pavement to reach the road needs a dropped kerb approved by the highway authority, and that approval has its own process and timescale. Sorting both before the start date avoids a finished drive you cannot legally use.
Plan where cars and vans will go
Your drive will be out of action from the moment it is dug out until the surface has cured or settled. Arrange somewhere to park, check any street parking rules and let other drivers in the household know. Space is also needed near the house for deliveries of aggregate and materials and, often, a skip or grab lorry. Agreeing where these will stand keeps the pavement and road clear.
- Somewhere to park for the whole job
- A spot for the skip or spoil heap
- Clear space for material deliveries
- A route for wheelbarrows and machinery
Mark drains, pipes and cables
Excavation for a new base goes deeper than many homeowners expect. Point out inspection chambers, gullies, outside taps, gas and water meters and any lighting or car charger cables you know about. Manhole covers usually need raising or replacing to sit flush with the new surface. If you have old plans or survey documents showing services, have them ready, because they save time and reduce the risk of damage.
Clear the area and protect the garden
Move pots, bins, bikes, garden furniture and anything stored at the front of the house. If plants in nearby borders matter to you, lift them or say which ones need protecting. Edges next to lawns and beds may be disturbed slightly as the new edging is set, so it helps to know where the finished boundary will be. Gates and fence panels in the way may need taking down for access.
Talk to your neighbours
A driveway job brings noise, dust, lorries and a busy pavement for a few days. A quick word with neighbours either side, and anyone who shares an access, prevents surprises. Let them know roughly when heavy deliveries will arrive and how long the work should take. If the boundary is shared, agree where the edge of the new drive will run before work begins.
During the work
Expect the old surface and soil to be removed first, then the sub-base laid and compacted, edging set, and finally the surface itself. Keep children and pets away from the working area and machinery. Ask questions as they come up, especially about levels and falls, as these are easiest to adjust before the surface goes down. Our driveways page explains how a job runs from survey to finish.
Pets, children and deliveries
Front gates may be open more than usual and lorries will be reversing, so keep dogs secure and remind children that the drive is a building site for a few days. Let parcel couriers know where to leave deliveries, or ask for a safe place, as the front step may be hard to reach while edging is going in.
If someone in the house has mobility needs, agree a safe route to the door before the old surface comes up. Temporary boards or a cleared path can usually be arranged when it is planned in advance.
After the surface goes down
Different materials need different settling or curing times before cars can use them, so follow the advice given for your surface. Keep heavy vehicles, skips and sharp stands off the new drive at first, and check that water runs where it was planned to after the first proper rain. Our driveway repairs page covers what to do if an older drive elsewhere on the property needs attention too.
Want a professional to handle it?
Let's make it happen.
Tell George what you're planning and let's talk through the possibilities for your home.
Frequently asked questions
Do I need to be home while the driveway is being laid?
Not all the time, but it helps to be available at the start to confirm levels, access and the location of drains and services, and at the end to go through the finished work.
Will my manhole covers be moved?
Covers are normally raised, lowered or replaced so they sit flush with the new surface. Access to the chamber itself stays where it is.
Can I keep using the drive during the work?
Usually not. Once the old surface is dug out the area is unsafe for vehicles until the new base and surface are finished and have settled or cured.
Should I sort the dropped kerb before work starts?
Yes. Approval comes from the highway authority, not the installer, so applying early means the kerb is in place or approved by the time the new drive is ready.