What happens in the first week of an extension build?

Day one and the first week of a house extension: site set-up, welfare, marking out, digging foundations, the building control inspection and pouring concrete.

The short answer
The first week of an extension is mostly about the ground. The site is set up and secured, the outline is marked out from the drawings, the footprint is cleared and the foundation trenches are dug. Building control usually inspects the trenches before concrete is poured, and drainage may be diverted. It is noisy and muddy, but it sets the position and level of everything that follows.

Before the start date

A smooth first day relies on paperwork being finished. Drawings should be final, planning approval or a lawful development position in place, and building control notified. If the work is close to a shared wall or boundary, the party wall process may apply; our party wall agreement guide explains when. Clear the garden area where the extension will stand and decide which rooms in the house will stay out of bounds.

Setting up the site

Day one usually starts with deliveries and getting the site safe. That can mean fencing or barriers around the working area, a skip or spoil area, a place to store materials and protection for paths and doorways. Access routes for barrows and machinery are agreed, and anything fragile near the work is moved. It can look like little building has happened, but this groundwork makes the rest of the job safer and faster.

Marking out from the drawings

The footprint is then set out on the ground using pegs, lines and levels taken from the approved plans. This is when the position of the walls against the house and boundaries becomes real, so it is a good moment to look and ask questions. Small errors here carry through every later stage, so setting out is checked carefully before any digging begins.

Digging the foundations

With the outline marked, turf, topsoil and any old paving are cleared and the trenches are dug. Their depth depends on the ground, nearby trees and drains, rather than a single fixed figure; our building regulations for extensions guide covers the factors involved. Spoil is removed or stored, and the trenches are kept clean and safe while they wait for inspection.

  • Clearing turf, soil and old surfaces
  • Digging trenches to the depth the ground needs
  • Exposing and protecting existing drains
  • Keeping trenches safe and dry

The building control inspection

Before concrete goes in, a building control inspector usually checks the excavations to confirm the ground is suitable and the depth is right. If the soil is softer than expected or roots are found, they may ask for the trenches to go deeper. This is normal and is exactly why the inspection happens. Once approved, concrete can be poured, often within the same day so the trenches do not deteriorate.

Drains and services

Extensions often sit over or beside existing drainage runs. In the first week, drains may be exposed, protected, re-routed or have new inspection points added, and any connection to a public sewer may need its own approval. Outside taps, cables or meter boxes on the back wall may also need temporarily moving. Expect occasional short interruptions, and you will be told when water or power is affected.

Living with the noise and mess

Groundwork is the loudest and messiest stage. Diggers, breakers and lorries mean dust and mud near the house, so keep windows on that side closed and plan quiet time elsewhere. Children and pets should stay well away from open trenches. Our how long does an extension take guide outlines how the later stages compare once the walls start rising.

Questions worth asking at the start

A short meeting on the first morning can settle many small questions. Ask where deliveries will go, which toilet the site team will use, what time work starts and finishes, and who to contact if a neighbour raises a concern. Confirm which doors and windows should stay shut, and where to park so the site stays clear.

It is also worth asking what the next few weeks look like once foundations are poured. Knowing roughly when the walls reach damp-proof course level, when the floor slab goes in and when the next inspection is due helps you plan deliveries for your own choices, such as doors, roof lights or kitchen units, without holding up the build.

Keeping communication simple

Agree how and when you will get updates, and keep a short list of questions as they arise. Decisions on things like door positions or floor levels are easier to make early than once the walls are up. Our house extensions page explains how a project is managed from the first visit through to completion.

YOUR NEXT PROJECT STARTS HERE

Want a professional to handle it?

Let's make it happen.

Tell George what you're planning and let's talk through the possibilities for your home.

Frequently asked questions

How deep will the foundation trenches be?

It depends on the soil, nearby trees and drains. Building control checks the trenches before concrete is poured and may ask for them to go deeper if the ground needs it.

Will I lose water or power on the first day?

Not usually for long. Short interruptions can happen if drains, pipes or cables need moving, and you should be told beforehand when that is planned.

Why does it look like little has been built after a week?

Most of the first week goes into the ground: setting out, digging, inspection and concrete. That hidden work decides the position and strength of everything above it.

Can I still use my back door during groundwork?

Sometimes, but open trenches and machinery often make the back of the house unsafe. Expect to use another entrance until the foundations are filled and the area is safe.