HOMEOWNER GUIDE

Living at home during an extension

How to plan for living in your house while an extension is built: noise, dust, kitchen and utilities, access, children and pets, and the stages that disrupt most.

The short answer
Most families stay at home while an extension is built, and with planning it is manageable. The early stages happen outside, so disruption inside is limited until the new space is joined to the house. The hardest period is usually the knock-through and any time the kitchen is out of action. Setting up a temporary kitchen, sealing off rooms against dust and agreeing access and working hours in advance make the biggest difference.

Which stages affect you most

An extension usually starts outdoors with groundworks, foundations and walls, which bring noise, deliveries and a busier garden but leave the house itself largely untouched. The roof and windows follow. Disruption moves indoors when the opening into the existing house is formed, services are connected and internal finishes go in. Our how long does an extension take guide explains the order of the stages.

Keeping the kitchen going

For kitchen extensions, there is often a spell with no working kitchen. A temporary setup in another room helps: a microwave, kettle, slow cooker or portable hob, a fridge and a washing-up bowl or access to a utility sink. Plan simple meals, stock up on easy breakfasts and keep crockery in one crate. Ask early how long the kitchen will be disconnected so you can prepare. Our kitchen extensions page explains that type of project.

  • Microwave and kettle
  • Portable hob or slow cooker
  • Fridge in another room
  • Somewhere to wash up
  • A crate for everyday crockery

Dust and noise

Keep a small clean zone for the household, ideally a living room and bedrooms upstairs, and treat it as off limits to work boots and tools. A doormat and a box of shoe covers at the boundary help. Run a vacuum with a good filter over floors each evening rather than leaving dust to spread. Electronics and soft furnishings near the work are best moved or wrapped. If anyone in the household has asthma or a dust allergy, mention it before work starts so the noisiest and dustiest days can be planned with that in mind. A few practical habits make the weeks of building much easier to live with.

Cutting, drilling and knocking through create fine dust that travels further than you expect. Before the opening is formed, clear the nearby rooms, cover what cannot move and hang dust sheets or temporary screens over doorways. Keep internal doors shut. Noise is unavoidable on working days, so people working from home may want a quiet room at the far end of the house or a few days elsewhere during the loudest work.

Water, power and heating

Connecting new rooms to the house sometimes means short shutdowns of water, electricity or heating. These are usually brief and can be planned around, but ask to be told in advance. In winter, the opening into the extension may be screened with a temporary partition to keep heat in until the new room is weathertight.

Access, parking and security

Deliveries, a skip and trades arriving each morning all need somewhere to go. Agree where materials will be stored, whether the drive is needed, and which route through the garden or house will be used. Think about security when part of the back of the house is open or screened, and check that any work affecting your home insurance has been mentioned to your insurer.

Children, pets and a safe home

A building site and a family home sit side by side during an extension. Keep children and pets away from the work area, close gates behind you, and agree a clear boundary the family does not cross. Dogs can find the noise stressful, so a quiet room or days out during heavy work may help. Tools and materials left out at the end of the day are a hazard, so it is fair to ask for the site to be left tidy.

Neighbours

Letting neighbours know when work will start, roughly how long it will run and what hours to expect goes a long way. If the extension is on or near a shared wall, the Party Wall etc. Act 1996 may require formal notice; our party wall agreement guide explains when. Keeping the street clear of mud and materials helps relations too.

Planning ahead

A short conversation before work starts covers most worries: working hours, the dates the kitchen or bathroom will be off, where the skip goes and who to call with questions. Our phone lines are open 8am to 6pm. Read about the work itself on our extensions and single storey extensions pages, and see the house extension cost guide for what affects a quote.

YOUR NEXT PROJECT STARTS HERE

Want a professional to handle it?

Let's make it happen.

Tell George what you're planning and let's talk through the possibilities for your home.

Frequently asked questions

Can I live in my house during an extension?

Most homeowners do. The early outdoor stages cause little disruption inside, and the harder periods such as the knock-through are usually short.

How do I cope without a kitchen?

Set up a temporary kitchen in another room with a microwave, kettle, portable hob and fridge, and plan simple meals for the weeks it is out of use.

When is the most disruptive stage?

Usually when the opening into the existing house is formed and services are connected, as this brings dust and noise inside.

Should I tell my insurer about building work?

It is sensible to let your home insurer know before work starts, as major building work can affect cover.