A dropped kerb is not a single price. It is made up of the council's own charges for considering and inspecting the application, the cost of building the crossing across the pavement to their standard, any work needed to move or protect services underneath, and the driveway you need behind it. Councils set and publish their own fees, and the works price depends on the width of the crossing and what is found under the footway. Your own council's current guidance is the only reliable source for the official part of the cost.
The council's charges
Because the pavement belongs to the highway authority, you pay them to assess your request. Most councils charge an application fee, and many charge for inspecting the finished crossing too. In Northamptonshire that will be either West Northamptonshire Council or North Northamptonshire Council, and each sets its own charges and process. Fees are usually not refunded if the application is refused, so it is worth reading the criteria before applying.
Some roads need extra consent. If the road is classified, planning permission may also be needed, which adds its own fee.
Building the crossing
The crossing itself involves lowering the kerbs, digging out the footway and rebuilding it to a stronger specification so it can carry cars. Depending on the council, this is done by their own contractor or by an approved firm working under licence. The main factors are the width of the crossing, the depth of construction the council requires and the surface material of the existing pavement.
- Number of kerbs to lower, set by the width
- Footway construction depth required
- Matching the existing pavement surface
- Traffic management while work is done
- Final inspection and sign-off
What lies under the pavement
Gas, water, electricity and telecoms cables often run beneath the footway. If they sit too shallow to be driven over, they may need lowering or protecting, and that work is charged by the utility company. Street lights, signs, trees and drainage gullies in the way can also add cost or, in some cases, make a crossing impossible in that position.
The driveway behind it
A dropped kerb is only useful if there is a proper driveway to park on. That part of the job sits on your land and is priced separately: excavation, sub-base, edging, the surface, and drainage so water does not run onto the pavement. If a wall or gate is in the way, opening it up is another item. Our dropped kerbs page explains how we plan the driveway to meet the crossing, and our driveway cost guide covers the groundwork.
Factors that raise or lower the total
A short, simple crossing on a wide pavement with no services in the way is at the lower end. A wide double crossing, a deep construction requirement, utilities to move or an extra planning application push it up. The surface of your new driveway and how much of the front garden is dug out also change the overall bill.
Avoiding wasted money
The most common way to lose money is to build a drive before checking whether the council will allow the crossing. Refusals happen for reasons such as parking depth, visibility or a nearby junction. Reading the criteria first, and applying before the drive is finished, protects you. Our dropped kerb planning permission guide explains the approval step.
Need it sorted?
Once you have checked your council's process, George can look at the frontage and quote for the driveway side of the work. Visit the dropped kerbs page or ask through the contact page.
Want a professional to handle it?
Let's make it happen.
Tell George what you're planning and let's talk through the possibilities for your home.
Frequently asked questions
Is the council fee refunded if my dropped kerb is refused?
Many councils do not refund application fees. Check your council's terms and criteria before applying.
Does a wider crossing cost more?
Yes. More kerbs need lowering and more footway needs rebuilding, so width is one of the main drivers.
Who pays for moving cables under the pavement?
The homeowner usually pays, through the utility company, if services need lowering or protecting for the crossing.
Is the driveway priced separately from the dropped kerb?
Normally yes. The crossing is council-controlled work on the highway, while the drive is built on your own land.