Snagging is the final check of finished work to spot small faults, unfinished details or damage before the job is signed off. Walk round in good light with the builder, note anything that is not right, and agree what will be put right and when. For an extension that means checking doors, windows, walls, floors, sockets and outside details; for paving it means levels, joints, edges and drainage. A calm, written list shared with the builder is the simplest way to get everything finished.
What snagging means
A snag is a small defect or unfinished item rather than a major problem. Think of a door that sticks, a missing piece of trim, a scuff on new plaster or a slab with a chipped corner. Most jobs have a handful, and a good builder expects to come back and deal with them. The aim of snagging is to catch them together, rather than discovering them one at a time over the following months.
When to do the walk round
Choose a time when the work is finished and the site has been cleared, in daylight, and ideally with the builder present. Allow enough time to look properly rather than rushing. It also helps to look again after a spell of rain, when any water issues with paving, gutters or roofs become obvious, and after you have lived with the new space for a few weeks.
Inside an extension
Open and close every door and window, checking they move freely, lock and seal. Look along walls and ceilings in side light, where dents and uneven plaster show up. Check that sockets, switches and lights work and that heating warms the room. Look at the joint between old and new walls and ceilings for cracks. Our extension first week guide describes the start of a project; this is the other end of it.
- Doors and windows open, close and lock
- Walls and ceilings in side light
- Sockets, switches and lights
- Heating and any underfloor system
- Joins between old and new
Outside an extension
Walk round the outside and look up as well as down. Check that brickwork is clean and the pointing is even, that gutters and downpipes are fixed and lead water into the drains, and that any roof edges and flashings look neat. Make sure the ground around the new walls slopes away from the building and that air bricks or vents are clear.
Patios and driveways
On new paving, walk the whole area and feel for any slabs or blocks that rock. Look for even joints, cleanly cut edges around drains and walls, and a consistent finish across the surface. After rain, check where the water goes: it should run away from the house to a drain or border, not sit in puddles. Our patio drainage and falls guide explains what a correct fall looks like.
Landscaping and garden works
For walls, check they are straight and the coping is secure. For fencing, see that posts are upright, panels are fixed and gates swing and latch. Steps should feel even and firm underfoot. New turf should be laid tight with no gaps, and borders left tidy. Check that spoil, offcuts and packaging have been cleared away and that the rest of the garden has been left as it was.
How to write and share the list
Keep the list simple: where the item is, what is wrong and, if helpful, a photo. Number each point so it is easy to refer to. Share it with the builder in writing and agree a date for the fixes. Most snags are quick to resolve, and a clear list helps both sides see when the job is truly complete.
Paperwork to collect at the end
Alongside the snagging, gather the documents that go with the finished work. For an extension, that includes the Building Regulations completion certificate, any electrical certificates and manufacturers' guarantees on products such as windows or roofing. Keep them together, as you may need them when you sell. Our building regulations for extensions guide explains the completion certificate.
Want a professional to handle it?
Let's make it happen.
Tell George what you're planning and let's talk through the possibilities for your home.
Frequently asked questions
Is it normal to have snags on a new extension?
Yes. Most building jobs have a few small items to finish or adjust. What matters is that they are listed and dealt with.
Should I hold back money until snags are fixed?
Agree the arrangement in advance as part of your payment terms, so both you and the builder know how the final payment links to finishing the work.
What is not a snag?
Hairline cracks in new plaster as an extension dries out are common and often dealt with at decoration, while structural movement or leaks are more serious and should be raised straight away.
When should I check new paving for drainage?
After the first good rain. That is when you can see whether water runs off the surface as intended or sits in puddles.
