A kitchen extension costs more than a plain extension of the same size because two projects sit inside one: the building work and the kitchen itself. The structure is priced on size, foundations, roof and glazing; on top of that come plumbing, waste pipes, extra electrics, ventilation, units, worktops, appliances and flooring. Deciding early where the sink, hob and island go is the best way to control the price.
Two budgets in one
It helps to split the total into the building shell and the kitchen fit-out. The shell covers groundwork, walls, roof, windows and doors and the opening into the house. The fit-out covers units, worktops, appliances, splashbacks and lighting. Homeowners are often surprised that the second can be as large as the first, depending on the kitchen they choose.
Being clear about who supplies what avoids gaps. Some people buy the kitchen separately and have it fitted once the room is plastered; others prefer one quote for everything.
Opening up the back of the house
Most kitchen extensions are about creating one big family space, which means removing much of the rear wall and sometimes internal walls too. Steel beams, padstones and temporary support are needed, along with structural calculations and building control sign-off. The wider the opening, the bigger the steel.
Water, waste and gas
Moving the sink or adding an island with a sink or hob means new pipes and waste runs, often under the new floor. If drains run beneath the extension, they may need rerouting or a build-over agreement. Moving a gas supply or boiler adds a specialist trade. Keeping wet areas near existing drainage saves money.
Electrics, ventilation and heating
Kitchens need dedicated circuits for ovens and hobs, plenty of sockets and good lighting. An extractor needs ducting to the outside. Underfloor heating is common in kitchen extensions because it frees walls for units, and it has to be planned before the floor is laid.
Glazing and light
Bifold or sliding doors and a roof lantern are popular in kitchen extensions and are among the bigger single costs. They also affect how much wall is left for units, so the kitchen layout and the glazing should be designed together rather than one after the other.
The kitchen itself
Unit quality, worktop material, appliance range and features like a boiling tap or wine fridge can change the fit-out cost enormously. An island adds worktop, units and often services. Setting a fit-out budget early means the building work can be planned around it.
- Units and doors
- Worktops and splashbacks
- Appliances and extraction
- Flooring and lighting
- Plumbing to sinks and island
Approvals and fees
As with any extension, budget for drawings, structural calculations, building control and any planning or party wall costs. Our house extension cost guide and single storey extension cost guide explain these in more depth.
Planning your quote
Bring a rough kitchen layout, even a sketch, and say whether you are supplying the kitchen. George can then quote for the building work with the services in the right places and the opening sized properly.
Want a professional to handle it?
Let's make it happen.
Tell George what you're planning and let's talk through the possibilities for your home.
Frequently asked questions
Should I choose the kitchen before the extension is designed?
Ideally, yes, at least the layout. Knowing where the sink, hob and island go lets drainage, electrics and glazing be planned correctly first time.
Does an island make a kitchen extension cost more?
Usually, especially if it includes a sink or hob, because water, waste and power have to run under the floor to reach it.
Can I supply my own kitchen?
Yes. Many homeowners buy the kitchen separately. Agree early who fits it and when, so the building work leaves the room ready.
Is moving the sink expensive?
It depends on how far it moves from existing drains. A short move is simple; a long run or a new connection costs more.
