HOMEOWNER GUIDE

What drawings do I need for an extension?

The difference between planning drawings, building regulations drawings and structural calculations for a house extension, and when each one is needed.

The short answer
Most extensions need more than one set of drawings. Planning drawings show the outside appearance and layout and are used for a planning application or to check permitted development. Building regulations drawings add the technical detail, such as foundations, wall build-ups, insulation, drainage and fire safety, and are used for a full plans application. Structural calculations from an engineer cover steel beams and other loads. Clear, complete drawings also give builders a shared basis for accurate quotes.

Why drawings matter

Drawings are how an idea becomes something a council can assess, a builder can price and a building control inspector can check. Without them, quotes are based on guesswork and each builder may be imagining a different extension. Investing in good drawings early tends to save time and arguments later, and helps you see the space before committing to it.

Planning drawings

These show the existing house and the proposed extension in plan and elevation, with a location plan and block plan showing the site. They focus on size, shape, roof form, windows and materials. If your extension falls within permitted development, you may not need a planning application, but drawings still help you confirm it meets the limits. Our guide to extension planning permission explains the general rules.

Building regulations drawings

This set adds the technical information that shows the extension will meet the building regulations. It typically covers foundation details, wall and roof construction, insulation, ventilation, drainage connections and fire safety. These are the drawings a builder relies on most during construction. Our guide to building regulations for extensions sets out what the regulations cover.

  • Foundation type and depth
  • Wall, floor and roof build-ups
  • Insulation and ventilation
  • Drainage and fire safety details

Structural calculations

Opening up the back of a house, removing internal walls or adding a second storey means new loads must be carried. A structural engineer sizes steel beams, lintels, padstones and sometimes foundations, and produces calculations that building control will want to see. On ground affected by trees, clay or drains, the engineer may also design the foundations.

Building notice or full plans

For many domestic extensions, there is a choice of building control route. A full plans application submits the detailed drawings for approval before work starts, giving certainty. A building notice lets work begin sooner with inspections along the way, but without approved plans in advance, so more is decided on site. For anything complex, the full plans route is usually the more predictable one.

Who produces the drawings

Architects, architectural technologists and plan drawing services all prepare extension drawings, with differing levels of design input. For a straightforward single-storey extension, a technical drawing service may be enough. For a complex or sensitive project, a designer who can explore options is valuable. Whoever you use, ask what is included: planning set only, or building regulations detail as well.

It is also worth asking how changes are handled once building starts. Small adjustments on site are normal, but significant changes to the structure or layout may need revised drawings, updated calculations and a fresh look from building control. Agreeing early who will update the drawings, and how, keeps the project moving and avoids confusion between the designer, the engineer and the builder.

Using drawings to get comparable quotes

Giving every builder the same drawings and specification means quotes can be compared line by line. Note anything not shown, such as kitchen fitting, flooring or decoration, so each price covers the same scope. Our guide on how to compare builder quotes explains what to look for.

Measured surveys and existing drawings

Before any new design is drawn, the designer needs accurate drawings of the house as it is now. This usually means a measured survey of the relevant rooms and outside walls, noting window positions, floor levels, drains and the location of the boundary. If drawings exist from when the house was built or previously altered, they help, but they still need checking on site because changes are often made during construction. Errors at this stage can lead to problems later, such as a steel beam that does not quite fit.

It is also worth gathering any previous planning or building control paperwork for the house, as earlier extensions can affect what is allowed now.

From drawings to building

Once drawings and approvals are in place, the build can be planned in detail. If you already have drawings, we can price from them; if you are at an earlier stage, we can discuss what you have in mind. See our extensions page and contact us for a visit and written quote.

YOUR NEXT PROJECT STARTS HERE

Want a professional to handle it?

Let's make it happen.

Tell George what you're planning and let's talk through the possibilities for your home.

Frequently asked questions

Do I need drawings if my extension is permitted development?

You will still need building regulations drawings for the construction, and planning-style drawings help confirm the design meets permitted development limits.

Can a builder work from planning drawings only?

Planning drawings lack the technical detail needed to build. Builders can price roughly from them, but the building regulations detail and structural calculations firm up the price.

What is a party wall drawing?

If the work affects a shared wall or digs near a neighbour's foundations, party wall notices may need drawings showing the work. Our party wall guide explains the general process.

How long do extension drawings take?

It varies with the designer's workload and how many revisions you want. Allow time for this stage before planning and building control timescales begin.